Fresh prediction calibration under a host service

Finite proposed scope; launching requires separate compute approval. See the current preparation and execution status. The previous calibration saved 1,813 passing simulated fits but could not supply a threshold after four starts were interrupted. It remains closed. The proposed replacement uses new random seeds and a host-managed service that passed the separate launcher-exit test. No previous allowance is reused.

The scientific question and numerical method stay the same: can the fitted pipeline predict later generated positions with the planned whole-forecast coverage? Calibration chooses an uncertainty threshold; a separate validation cohort tests it. This does not yet establish an error law for actual aircraft or statistical significance of the Earth-model comparison.

Finite proposed allowance

Item Calibration Independent validation
Seed families 299 181
Required settings and starts per family 24 24
Maximum fit starts 7,176 4,344
Workers × threads each 4 × 1 4 × 1
Maximum evaluations per fit 200 200
Linear-operation ceiling per fit 620 620
Maximum iterations per linear operation 100 100
Retries 0 0
Cooperative wall ceiling 240 hours 144 hours
Minimum free disk before launch 55 GiB 35 GiB

At the last campaign's measured rate, calibration is estimated at 153 hours (6.4 days) and validation at 93 hours (3.9 days), using four numerical threads. These are extrapolations, not deadlines or promises. The separate wall ceilings remain 240 and 144 hours. Validation is conditional on a usable calibration threshold.

Calibration uses seeds 281474977610656–281474977610954. Validation uses 281474977710656–281474977710836. All previously declared cohorts, including their unused seeds, remain excluded. Calibration and validation have separate manifests, allowances and journals. Validation cannot start without its own complete, source-bound calibration handoff.

The numerical ceilings, error process, physical models, calibration bounds, processing cases and both input laws are inherited unchanged. The four-worker allocation is the entire permitted numerical allocation while a phase runs. The original 53-stretch results and protected ESA recordings are untouched.

The frozen cohort policy explicitly requires no interrupted outcomes. A single lost charged start blocks further continuation of either phase; a completed unsuccessful numerical start remains subject to the original repeat-selection rule. This separates an interrupted calculation from a completed poor fit.

Implementation and qualification

Use the existing lll.studies lifecycle and shared calibration executor. Add analysis/lll/studies/prediction_release.py for declarative fresh releases and the small analysis/lll/host_prediction_release.py configuration. Do not copy a worker, fitter, noise generator or numerical method.

The combined 48-case optimizer qualification remains the numerical prerequisite. An explicit source bridge permits only the tested interruption-reporting update in prediction_calibration_report.py, with exact old/new hashes. Restore that one historical hash when verifying the original qualification binding; require every other qualified source and the environment to match. No mathematical source is excepted. Preserve all historical reports unchanged.

Reuse the exact hash-pinned original qualification report and verify both sealed parent completions. Check the current source set through that reporting-only bridge; do not recompute a historical verdict using changed reporting code.

Before launching, require deterministic checks in analysis/tests/test_host_prediction_release.py: disjoint cohorts, unchanged noise and bounds, the exact reporting-source bridge, fail-closed handoff and disk/lease guards. Bind the complete required suite to the new sources and environment. Independently verify the calibration freeze, exact charges, storage estimate and host-service command before requesting compute approval. No saved fit is rerun for this qualification. The current status page records which preparation gates have passed.

Execution and storage

Use a uniquely named host user service, the frozen adapter and the shared runner. Disable automatic restarts. Check leases and completion before every launch. After an interruption, keep starts charged and use the qualified recovery checker; never duplicate a worker or restart a closed phase.

The host must remain running, with its user service manager active. Normal submitter exit was tested; survival of host reboot, container reset or logout was not. No process is signaled to enforce a deadline. Existing cooperative checks provide the finite wall allowance.

The disk figures above are launch reserves, not permanent-retention targets. After completion, hash-verified evidence is deduplicated into bounded archives and recoverable working copies are compacted. Preserve raw inputs, charged failures and provenance. Packaging must never refit.